Avoiding delays!
Sample application: Deviations on site
The concrete is about to be delivered, but there are some deviations in the local conditions for the scaffold.
Sections of the scaffold have to be redesigned. Until the modified shoring has been planned and approved, it may delay further works by days or even weeks.
Not with FFC²!
Reduced material usage!
Sample application: Shortage of scaffolding material
An erection cannot be carried out due to a shortage of material, the schedule runs out of control, the costs rise. When planning according to the standard applications of scaffolding systems, usually more material is used than is necessary from a static point of view.
With FFC² scaffolding can be planned in such a way, that 100% safety is guaranteed with less material usage (compared to standard application).
In addition FFC² also works with various module scaffolds, so that you can realise scaffold sections with different falsework systems. This is efficient shoring!
100% safety for any scaffold!
Sample application: Beyond regular applications
FFC² calculates based on the technical data of each component of a scaffolding system. All external factors affecting the shoring (loads, wind, foundation) can be adapted to the conditions on site and will be considered including the falsework specifics.
This means that any scaffolding can be planned easily and rapidly, even for non-standard applications. Modifications and improvements can be made directly via the configurator.
As a result, you receive an ideal scaffold with regard to load-bearing capacity and use of material as well as a verifiable check of stability.
AVAILABLE SHORING-SYSTEMS
CupLock
ISCHEBECK TITAN
PERI PD8
DOKA Staxo
PERI MDS
PERI-Up Flex
HÜNNEBECK ST60
PERI Multiprop